Roll No. [T Total No. of Pages : 02
Total No. of Questions : 05
--- Content provided by FirstRanker.com ---
B. Arch. (Sem.-9)
BUILDING CONSTRUCTION - VI
Subject Code : AR-523
M.Code : 45065
Time : 4 Hrs. Max. Marks : 100
--- Content provided by FirstRanker.com ---
INSTRUCTIONS TO CANDIDATES :
- Attempt any THREE Questions in total.
- Question No. 1 is COMPULSORY. Use any suitable scale for your drawing work.
- Assume any missing data.
- Prepare the following working drawings from the given plan (Figure A) :
- First floor plan
- Any one detailed elevation or any one detailed-section
--- Content provided by FirstRanker.com ---
- Discuss the concept of prefabrication in building industry. Give advantages and disadvantages of on-site and off-site prefabrication. Sketch out any 3 prefabricated building components. (25)
- Highlight the concept of modular coordination in buildings. Describe a basic module “M”. Give sketches of any 3 structural modules. (25)
- What are curtain-walls? Where are they used? Describe materials used for constructing curtain walls. Draw cross section of any one curtain wall system giving all dimensions and specifications. 25)
- Draw detailed working drawing plan of a commercial kitchen. Assume suitable size of the commercial kitchen. 25)
--- Content provided by FirstRanker.com ---
Figure - A
NOTE : Disclosure of identity by writing mobile number or making passing request on any page of Answer sheet will lead to UMC case against the Student.
--- Content provided by FirstRanker.com ---
This download link is referred from the post: Pharm D Last 12 Years 2010-2022 Question Papers (1st Year, 2nd Year, 3rd Year, 4th Year and 5th Year)
--- Content provided by FirstRanker.com ---