FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTUA B.Tech 4-2 R13 2018 April 13A01801 Urban Transportation Planning Question Paper

Download JNTUA (JNTU Anantapur) B.Tech R13 (Bachelor of Technology) 4th Year 2nd Semester 2018 April 13A01801 Urban Transportation Planning Previous Question Paper || Download B-Tech 4th Year 2nd Sem 13A01801 Urban Transportation Planning Question Paper || JNTU Anantapur B.Tech 4-2 Previous Question Paper || JNTU Anantapur B.Tech ME 4-2 Previous Question Paper || JNTU Anantapur B.Tech CSE 4-2 Previous Question Paper || JNTU Anantapur B.Tech Mech 4-2 Previous Question Paper || JNTU Anantapur B.Tech EEE 4-2 Previous Question Paper || JNTU Anantapur B.Tech ECE 4-2 Previous Question Paper

This post was last modified on 10 September 2020

JNTU Anantapur B-Tech 4-2 last 10 year question papers 2010 -2020 -All regulation- All branches- 4th Year 2nd Sem


FirstRanker's choice

FirstRanker.com

Code: 13A01801

--- Content provided by FirstRanker.com ---

B.Tech IV Year II Semester (R13) Regular & Supplementary Examinations April 2018

URBAN TRANSPORTATION PLANNING

(Civil Engineering)

Time: 3 hours

Max. Marks: 70

--- Content provided by⁠ FirstRanker.com ---

PART - A

(Compulsory Question)

Answer the following: (10 X 02 = 20 Marks)

  1. What is the general classification of trips based on purpose?
  2. What are the various items to be considered for the selection of a model?
  3. --- Content provided by‌ FirstRanker.com ---

  4. There are about 1000 addresses are available in the original list. The no of samples selected are 20 from the original list for home interview surveys. There are about 4 samples are ineligible while there was no response from 2 addresses. Find out the expansion factor.
  5. Explain the difference between aggregate and disaggregate models with suitable examples.
  6. What are the basic assumptions made in regression analysis?
  7. Discuss about the influence of income on trip generation.
  8. Explain the use of diversion curves.
  9. --- Content provided by FirstRanker.com ---

  10. What is trip end model?
  11. What are the objectives of project evaluation?
  12. What are the things to be considered in direct cost estimation of transportation projects?

PART - B

(Answer all five units, 5 X 10 = 50 Marks)

--- Content provided by‌ FirstRanker.com ---

UNIT - I

Explain the structure of Lowry land use model.

Explain the concepts used in travel demand forecasting.

OR

UNIT - II

--- Content provided by‌ FirstRanker.com ---

Discuss briefly about the factors considered in deciding the study area and traffic zones.

OR

Explain various stages involved planning process.

UNIT - III

A self constrained town consists of four residential areas A, B, C and D and two industrial areas X and Y. Generation equations the for the design year, the trips from home to work generated by each residential area per 24 hr day are as follows:

--- Content provided by⁠ FirstRanker.com ---

A 1000
B 2200
C 1800
D 3000

Travel time in minutes

Zone X Y
A 15 20
B 15 10
C 10 10
D 15 20

There are 4000 jobs in industrial area X and 5000 in industrial estate Y. It is known that the attraction between zones is inversely proportional to the square of journey times. Calculate and tabulate inter zone trips for journeys from home to work using gravity model.

OR

What are the advantages and disadvantages of growth factor methods?

UNIT - IV

--- Content provided by‌ FirstRanker.com ---

What are the different applications of traffic assignment?

OR

Explain the model split with help flow diagram at trip generation stage.

UNIT - V

Explain the concept of Net Present Value.

--- Content provided by​ FirstRanker.com ---

OR

A new bypass is to be constructed at a busy city. The length of bypass will be 7.5 km and the length of the existing road is 8 km. The cost of the project is likely to be Rs.10,000,000. The speed of the traffic through the town is 48 kmph. And the present traffic is 800 vph. The predicted traffic after completion of project is 8500 vehicles/day out of which 55% will use bypass. It is computed if the bypass is not built, the traffic through the city will move at a speed of 42 kmph due to increased traffic. If the bypass is built the traffic on the bypass will be 80 kmph and that through the city will be 55 kmph. The travel costs for different speeds are 42 kmph, Rs.3.50/-, 55 kmph-Rs.3.40/- and 80 kmph-Rs.3.1/-. It is expected that the cost of construction of the bypass will bring down the accident rate from 1.8 per million vehicle km on the existing route to 0.5 per million vehicle km on the bypass. The cost of accident can be taken as Rs.50,000 and the maintenance cost per km is Rs.25,000/-. Compute the first year of return. Justify the project based on the minimum 50% return in first year.


This download link is referred from the post: JNTU Anantapur B-Tech 4-2 last 10 year question papers 2010 -2020 -All regulation- All branches- 4th Year 2nd Sem

--- Content provided by FirstRanker.com ---