Download JNTUA B.Tech 4-2 R13 2018 July Supple 13A03801 Industrial Engineering Question Paper

Download JNTUA (JNTU Anantapur) B.Tech R13 (Bachelor of Technology) 4th Year 2nd Semester 2018 July Supple 13A03801 Industrial Engineering Previous Question Paper || Download B-Tech 4th Year 2nd Sem 13A03801 Industrial Engineering Question Paper || JNTU Anantapur B.Tech 4-2 Previous Question Paper || JNTU Anantapur B.Tech ME 4-2 Previous Question Paper || JNTU Anantapur B.Tech CSE 4-2 Previous Question Paper || JNTU Anantapur B.Tech Mech 4-2 Previous Question Paper || JNTU Anantapur B.Tech EEE 4-2 Previous Question Paper || JNTU Anantapur B.Tech ECE 4-2 Previous Question Paper


Code: 13A03801


B.Tech IV Year II Semester (R13) Advanced Supplementary Examinations July 2018
INDUSTRIAL ENGINEERING
(Mechanical Engineering)

Time: 3 hours Max. Marks: 70

PART ? A
(Compulsory Question)

*****
1 Answer the following: (10 X 02 = 20 Marks)
(a) What is the contribution of FW Taylor?
(b) List the functions of management.
(c) Define plant layout.
(d) List the various factors considered in design of plant layout.
(e) Write a note on work study.
(f) What is meant by work sampling?
(g) What is EOQ model?
(h) Discuss on probabilistic models.
(i) What is SQC?
(j) Explain acceptance sampling.

PART ? B
(Answer all five units, 5 X 10 = 50 Marks)

UNIT ? I

2 Explain the characteristics of scientific management. Discuss any two schools of management.
OR
3 Explain different types of private sector organization with respect to their formation.

UNIT ? II

4 Discuss the factors influencing plant location.
OR
5 Explain the selection criteria of material handling equipment.

UNIT ? III

6 What is work study? Discuss objectives and advantages of work study.
OR
7 What are objectives of time study? Discuss the advantages of time study.

UNIT ? IV

8 Derive the relation for EOQ.
OR
9 Discuss the techniques of inventory control.

UNIT ? V

10 Explain the following attributes charts:
(a) Attribute charts for defective items (P-chart).
(b) Attribute chart for number of defects per unit (C-chart)
OR
11 Discuss the methodology of double sampling plan.

*****