Code No: 814AZ R13
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
--- Content provided by FirstRanker.com ---
MCA IV Semester Examinations, June/July - 2018
SOFTWARE PROJECT MANAGEMENT
Time: 3 Hours Max. Marks: 60
Note: This question paper contains two parts A and B.
Part A is compulsory which carries 20 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 8 marks and may have a, b as sub questions.
--- Content provided by FirstRanker.com ---
PART - A 5 x 4 Marks = 20
- What are the risks in the waterfall model and how they are eliminated?
- List the important trends in improving software economics.
- Write the typical software development plan outline.
- Explain process automation.
- What are the basic characteristics of a good metric? Explain.
--- Content provided by FirstRanker.com ---
PART - B 5 x 8 Marks = 40
- a) What is conventional software management? Explain the Boehm’s top ten principles. [8]
OR
b) Discuss about the results of conventional software project design reviews. - a) What are the five components of software cost models? Explain. [4+4]
OR
b) Write the advantages and disadvantages of commercial components versus custom software. Emphasize about peer inspections in achieving required quality. [4+4] - a) What are the top five principles of a modern process? Explain. [4+4]
OR--- Content provided by FirstRanker.com ---
b) Write about the crucial attributes of successful software project managers. - a) Discuss the primary objectives, essential activities, primary evaluation criteria of engineering and production stages. [8]
OR
b) Write a detailed note on pragmatic artifacts. - a) What is vision document? What is its purpose? Outline the typical vision document.[4+4]
--- Content provided by FirstRanker.com ---
OR
b) Write the advantages and disadvantages of traditional Work Breakdown Structures. What is the content of minor and major checkpoints and status assessments? [4+4] - a) What are the main features of the default organization? Discuss about default project organization structure and their responsibilities. [8]
OR
b) Explain how process automation and change management are critical to an iterative process and how does metric automation become crucial to effective project control. [8] - a) Write short notes on the following:
a) Process Maturity b) Quality Indicators c) Configuration Control Board. [8]
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
This download link is referred from the post: JNTUH MCA 4th Sem Last 10 Years 2023-2013 Question Papers R20-R09 || Jawaharlal nehru technological university