Download PTU B.Arch 2020 March 6th Sem 72292 Estimating, Costing And Specifications I Question Paper

Download PTU (I.K. Gujral Punjab Technical University Jalandhar (IKGPTU) B.Arch 2020 March (Bachelor of Architecture) 6th Sem 72292 Estimating, Costing And Specifications I Previous Question Paper

This post was last modified on 31 March 2020

PTU B-Arch 2020 March Previous Question Papers


FirstRanker.com

Firstranker's choice

FirstRanker.com

--- Content provided by‌ FirstRanker.com ---



Roll No. ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ Total No. of Pages : 03

Total No. of Questions : 09

B.Arch.(2012 & Onwards) (Sem.-6)

--- Content provided by‍ FirstRanker.com ---

ESTIMATING, COSTING & SPECIFICATIONS -1

Subject Code : BACH-606

M.Code : 72292

Time : 3 Hrs. Max. Marks : 60

INSTRUCTIONS TO CANDIDATES :

--- Content provided by‍ FirstRanker.com ---

  1. Attempt total FIVE questions with minimum TWO questions from EACH UNIT and COMPULSORY question no. 1.
  2. Assume the missing data if any and mention that along with answer.

Q1. a) What do you mean by Estimate? (2)

b) Enlist the different types of specification? (2)

c) What are the units of measurement for plaster work in cement mortar? (2)

--- Content provided by‍ FirstRanker.com ---

d) What do you mean by standard PWD specification? (2)

e) What are the units of measurement for earth work in excavation? (2)

UNIT-I

Q2. Enlist the different types of Estimate. Discuss the need and importance of estimate at various stages of project. Explain the most accurate method of estimation, in detail. (12.5)

Q3. Calculate the material requirement i.e. No. of Cement Bags, Sand, Bricks, and Coarse Aggregate for the following items :

--- Content provided by‍ FirstRanker.com ---

a) Cement concrete in 1:2:4 for R.C.C. work excluding reinforcement for total 200 cubic meter quantity. (6)

b) 230 mm thick first class brick masonry works for the superstructure of 130 cum quantity in cement mortar 1:6. (6.5)

FirstRanker.com


FirstRanker.com

--- Content provided by‍ FirstRanker.com ---

Firstranker's choice





--- Content provided by⁠ FirstRanker.com ---






--- Content provided by​ FirstRanker.com ---






--- Content provided by‍ FirstRanker.com ---






--- Content provided by FirstRanker.com ---






--- Content provided by​ FirstRanker.com ---



Q4. “To finalise the rate of an item, the analysis of rates is must.” Justify the statement in context of cost estimation of a multi storied structure with examples. (12.5)

Q5. Calculate the estimate of bill of quantities of the following items for a single storied structure as given plan. (Assume section by your own)

a) Earth Work in excavation in foundation

--- Content provided by⁠ FirstRanker.com ---

b) Brick work in superstructure (4)

c) Cement Plaster inside the building (4.5)

This download link is referred from the post: PTU B-Arch 2020 March Previous Question Papers