Roll No. ‘ ‘ ’ ‘ ‘ ’ ‘ ‘ ‘ ‘ ’ ‘ Total No. of Pages : 01
Total No. of Questions : 06
--- Content provided by FirstRanker.com ---
B. Architecture (2012 & Onwards) (Sem.-10)
PROFESSIONAL PRACTICE-I
Subject Code : BACH-1003
M.Code : 74342
Time : 3 Hrs. Max. Marks : 60
--- Content provided by FirstRanker.com ---
INSTRUCTIONS TO CANDIDATES :
- QUESTION NO 1 is Compulsory.
- Attempt any Other FOUR Questions with at least one from each part.
- Write brief note on the following :
- Name the statutory and voluntary body of architecture.
- Name the act under which the statutory body was formed. State one of its major role.
- What is arbitration and who is an arbitrator?
- What is a contract? Name any two building contracts.
- Define a tender and enlist its types.
- Briefly discuss the role of ITA in promoting architectural profession.
--- Content provided by FirstRanker.com ---
(12)
--- Content provided by FirstRanker.com ---
PART-A
- What are the beneficial and detrimental effects of architectural competitions? Give the classification of architectural competitions.
(12)
- Write the aims and objectives of council of Architecture. Give at least ten points of professional code of conduct.
(12)
--- Content provided by FirstRanker.com ---
- What is the role played by board of assessors, technical advisors and professional advisors? Give guidelines for conducting architectural competitions?
(12)
PART-B
- Give various reasons for which valuation of property is done. And also discuss the methods of valuation.
(12)
--- Content provided by FirstRanker.com ---
- What are the various duties, responsibilities and liabilities of client architect and contractor?
(12)
NOTE : Disclosure of identity by writing mobile number or making passing request on any page of Answer sheet will lead to UMC case against the Student.
--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU B-Arch 2020 March Previous Question Papers
--- Content provided by FirstRanker.com ---