Download GTU BE/B.Tech 2019 Summer 8th Sem New 2180207 Applied Industrial Engineering In Automobile Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 8th Sem New 2180207 Applied Industrial Engineering In Automobile Previous Question Paper

1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VIII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2180207 Date:09/05/2019

Subject Name:Applied Industrial Engineering In Automobile

Time:10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.

MARKS

Q.1 (a)
Define the term: 1) Standardisation 2) Simplification
03
(b) Write Objectives of Production Planning and Control. 04
(c)
What is quality circle? Discuss its basic philosophy.
07

Q.2 (a)
Define the term process planning
03
(b)
Explain various tools for increasing productivity.
04
(c)
What is SWOT analysis and why is it required?
07
OR
(c)
Why a job is broken down in elements? Discuss it.
07
Q.3 (a) Define Pareto analysis and state importance of it. 03
(b)
What is Economic Order Quantity?
04
(c)
Explain cost of quality and discuss appraisal and failure cost.
07
OR
Q.3 (a) State use of PDCA for continues improvement tool. 03
(b) Define:
1) Basic Time
2) Normal Time
3) Observed Time
4) Standard Time
04
(c)
What is FMEA? Discuss its importance with suitable example.
07
Q.4 (a) Explain the concept of 6? in brief and it?s importance. 03
(b) Define the following terms:
a) Reliability
b) Failure rate
c) MTTF
d) MTBF
04
(c) Explain the concept of ?5S? for implementation in Automobile
dealership workshop.
07
OR
Q.4 (a)
Discuss the origin and development of OR.
03
(b)
What are the limitations of OR.
04
(c)
Explain Just in time concept of manufacturing.
07
Q.5 (a) State benefits of implementing ISO 14000 in an organization. 03
(b)
Differentiate between OPC and FPC
04
(c)
Write a short note on 1)PMTS 2) MTM
07







FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VIII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2180207 Date:09/05/2019

Subject Name:Applied Industrial Engineering In Automobile

Time:10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.

MARKS

Q.1 (a)
Define the term: 1) Standardisation 2) Simplification
03
(b) Write Objectives of Production Planning and Control. 04
(c)
What is quality circle? Discuss its basic philosophy.
07

Q.2 (a)
Define the term process planning
03
(b)
Explain various tools for increasing productivity.
04
(c)
What is SWOT analysis and why is it required?
07
OR
(c)
Why a job is broken down in elements? Discuss it.
07
Q.3 (a) Define Pareto analysis and state importance of it. 03
(b)
What is Economic Order Quantity?
04
(c)
Explain cost of quality and discuss appraisal and failure cost.
07
OR
Q.3 (a) State use of PDCA for continues improvement tool. 03
(b) Define:
1) Basic Time
2) Normal Time
3) Observed Time
4) Standard Time
04
(c)
What is FMEA? Discuss its importance with suitable example.
07
Q.4 (a) Explain the concept of 6? in brief and it?s importance. 03
(b) Define the following terms:
a) Reliability
b) Failure rate
c) MTTF
d) MTBF
04
(c) Explain the concept of ?5S? for implementation in Automobile
dealership workshop.
07
OR
Q.4 (a)
Discuss the origin and development of OR.
03
(b)
What are the limitations of OR.
04
(c)
Explain Just in time concept of manufacturing.
07
Q.5 (a) State benefits of implementing ISO 14000 in an organization. 03
(b)
Differentiate between OPC and FPC
04
(c)
Write a short note on 1)PMTS 2) MTM
07







2

OR
Q.5 (a)
Define SCM. Explain the need for SCM.
03
(b)
State therbligs with their abbreviation and symbol of each.
04
(c) A firm produces three products P,Q,and R, each of which need to
be processed in three departments, milling, grinding, and
packaging. Each unit of product P requires four, five, and three
hours in each of the three departments. Likewise, product Q
requires eight, five and five hours, while product R requires two,
five, and six hours in the three departments respectively. Everyday
96,108, and 150 hours are available in the three departments. The
unit contribution of the products P,Q, and R is Rs 6, Rs12, and Rs
8 respectively. Formulate the given problem as an LPP and find
the solution.
07

*************