Download GTU BE/B.Tech 2017 Winter 3rd Sem Old 132905 Basic Engineering In Textile Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2017 Winter 3rd Sem Old 132905 Basic Engineering In Textile Previous Question Paper

1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?III (OLD) EXAMINATION ? WINTER 2017
Subject Code:132905 Date:29/11/2017

Subject Name: Basic Engineering in Textile

Time: 10:30 AM to 01:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.

Q.1 (a) What is coal fired boiler? Explain the working of any one fire tube boiler with
neat sketch.
07
(b) Explain humidification by air washer method with neat sketch. 07

Q.2 (a) Explain importance of preventive maintenance vs. breakdown maintenance. 07
(b) A company produces 2 types of hats A and B. every hat A requires twice as
much labor time as the second hat B. if company produces only hat B then it
can produce a total of 500 hats per day. The market limits daily sales of hat A
and B to 150 and 250 respectively. The profits on hat A and B Rs.8 and Rs. 5
respectively. Solve graphically to get the optimal solution of LPP.
07
OR
(b) 1. Explain the basic procedure for work-study and its definition.
2. Define work measurement technique.
3. Define standard time, normal time and definition of rating.
07

Q.3 (a) A company has four plants each of which can manufacture any one of four
products. Product differ from one plant to another as follows:
Plant
Product
P Q R S
1 33 40 43 32
2 45 28 30 23
3 42 29 35 29
4 27 42 45 38
Find out which product each plant should produce to minimize cost.
07
(b) Write short note on SIMO chart. 07
OR
FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?III (OLD) EXAMINATION ? WINTER 2017
Subject Code:132905 Date:29/11/2017

Subject Name: Basic Engineering in Textile

Time: 10:30 AM to 01:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.

Q.1 (a) What is coal fired boiler? Explain the working of any one fire tube boiler with
neat sketch.
07
(b) Explain humidification by air washer method with neat sketch. 07

Q.2 (a) Explain importance of preventive maintenance vs. breakdown maintenance. 07
(b) A company produces 2 types of hats A and B. every hat A requires twice as
much labor time as the second hat B. if company produces only hat B then it
can produce a total of 500 hats per day. The market limits daily sales of hat A
and B to 150 and 250 respectively. The profits on hat A and B Rs.8 and Rs. 5
respectively. Solve graphically to get the optimal solution of LPP.
07
OR
(b) 1. Explain the basic procedure for work-study and its definition.
2. Define work measurement technique.
3. Define standard time, normal time and definition of rating.
07

Q.3 (a) A company has four plants each of which can manufacture any one of four
products. Product differ from one plant to another as follows:
Plant
Product
P Q R S
1 33 40 43 32
2 45 28 30 23
3 42 29 35 29
4 27 42 45 38
Find out which product each plant should produce to minimize cost.
07
(b) Write short note on SIMO chart. 07
OR
2
Q.3 (a) Using Simplex method solve the LPP.
Maximize Z = 15X 1+6X 2+9X 3+2X 4
Subject to, 2X 1+X 2 +5X 3+6X 4? 20
3X 1+X 2 +3X 3+25X 4? 24
7X 1+X 4 ? 70
X 1?0, X 2?0, X 3?0, X 4?0
07
(b) How is the job selected for method study? 07

Q.4 (a) Explain the various steps involved in time study. 07
(b) Discuss the merits and demerits of water tube boiler and fire tube boiler. 07
OR
Q.4 (a) A small project involves 7 activities, and their time estimates are listed in the
following table. Activities are identified by their beginning and ending node
number.
Activity
(i - j)
Estimated Duration(Weeks)
Optimistic Most likely Pessimistic
1-2 1 1 7
1-3 1 4 7
1-4 2 2 8
2-5 1 1 1
3-5 2 5 14
4-6 2 5 8
5-6 3 6 15
1. Draw the network Diagram of the activities in the project.
2. Find expected duration and variance for each activity. What is expected
project length?
3. What is probability that project will be completed at least 4 weeks earlier
than expected time?
07
(b) Explain any one feed water treatment method with neat sketch. 07

Q.5 (a) Solve the following transportation problem starting with the initial solution
obtained by VAM.
D 1 D 2 D 3 D 4 Supply
07
FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?III (OLD) EXAMINATION ? WINTER 2017
Subject Code:132905 Date:29/11/2017

Subject Name: Basic Engineering in Textile

Time: 10:30 AM to 01:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.

Q.1 (a) What is coal fired boiler? Explain the working of any one fire tube boiler with
neat sketch.
07
(b) Explain humidification by air washer method with neat sketch. 07

Q.2 (a) Explain importance of preventive maintenance vs. breakdown maintenance. 07
(b) A company produces 2 types of hats A and B. every hat A requires twice as
much labor time as the second hat B. if company produces only hat B then it
can produce a total of 500 hats per day. The market limits daily sales of hat A
and B to 150 and 250 respectively. The profits on hat A and B Rs.8 and Rs. 5
respectively. Solve graphically to get the optimal solution of LPP.
07
OR
(b) 1. Explain the basic procedure for work-study and its definition.
2. Define work measurement technique.
3. Define standard time, normal time and definition of rating.
07

Q.3 (a) A company has four plants each of which can manufacture any one of four
products. Product differ from one plant to another as follows:
Plant
Product
P Q R S
1 33 40 43 32
2 45 28 30 23
3 42 29 35 29
4 27 42 45 38
Find out which product each plant should produce to minimize cost.
07
(b) Write short note on SIMO chart. 07
OR
2
Q.3 (a) Using Simplex method solve the LPP.
Maximize Z = 15X 1+6X 2+9X 3+2X 4
Subject to, 2X 1+X 2 +5X 3+6X 4? 20
3X 1+X 2 +3X 3+25X 4? 24
7X 1+X 4 ? 70
X 1?0, X 2?0, X 3?0, X 4?0
07
(b) How is the job selected for method study? 07

Q.4 (a) Explain the various steps involved in time study. 07
(b) Discuss the merits and demerits of water tube boiler and fire tube boiler. 07
OR
Q.4 (a) A small project involves 7 activities, and their time estimates are listed in the
following table. Activities are identified by their beginning and ending node
number.
Activity
(i - j)
Estimated Duration(Weeks)
Optimistic Most likely Pessimistic
1-2 1 1 7
1-3 1 4 7
1-4 2 2 8
2-5 1 1 1
3-5 2 5 14
4-6 2 5 8
5-6 3 6 15
1. Draw the network Diagram of the activities in the project.
2. Find expected duration and variance for each activity. What is expected
project length?
3. What is probability that project will be completed at least 4 weeks earlier
than expected time?
07
(b) Explain any one feed water treatment method with neat sketch. 07

Q.5 (a) Solve the following transportation problem starting with the initial solution
obtained by VAM.
D 1 D 2 D 3 D 4 Supply
07
3
O 1 2 2 2 1 3
O 2 10 8 5 4 7
O 3 7 6 6 8 5
Demand 4 3 4 4 15

(b) 1. Explain humidification and dehumidification.
2. Define: RH, WBT,DPT.
07
OR
Q.5 (a) A project consist of a series of tasks labeled A, B??H, I with the following
constraints, A< D, E; B, D < F; C < G; B < H; F, G < I; W < X, Y means X and Y
cannot start until W is completed. You are required to construct a network
using this network using the notation. Also find the minimum time of
completion of the project when the time of completion of each task is given as
follows:
Task A B C D E F G H I
Time(Days) 23 8 20 16 24 18 19 4 10

07
(b) Define and distinguish the earliest and the latest start time and the earliest
and the latest finish time. Explain optimistic time, pessimistic time, most likely
time in relation to PERT.